Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: daixieit

COMP2913 Software Engineering Project

Resit Assessment

Description

This assessment has a total of 50 marks available.

If you worked on the software engineering group project you should complete the work with reference to that project.  If you did not complete the software engineering group project you should describe a group project you have completed this year.

You should name the module, the piece of work and how many of you worked in your group.

Guidelines

This report should be a maximum of FIVE A4 pages in length. Please use a professional 12pt font, eg. Times New Roman or Arial.

The submitted file must be a PDF document.

This report is individual and usual rules for plagiarism apply for all content.

Deadline

Monday 15th August 2022, 5pm

Content

The report should start with your name and username. The report should use the following three numbered sections:

1. Your role in a team

(a) Describe the project that was completed.   Include the module name, a brief

description of the work, and the size of the group that completed the work.

[2 marks]

(b) Using the Belbin role analysis tools linked under Lecture 2 for this module state the roles that you identify most closely with.

[4 marks] (c) Discuss your own strengths and weaknesses in the context of the role analysis.

[4 marks]

2. Working as a team

(a) How did you organise the work on the project?

[4 marks] (b) What was the allocation of work for this project for each team member?

[4 marks]

(c) What was the schedule for completion of work?  You should discuss how the required work was shared between the group and any sub-groups you chose.

[4 marks]

(d) How did you monitor progress of the work during the project?   What risk- mitigation strategies were used in case of delays caused by:

i. illness to team members?

[4 marks]

ii. technical problem in implementation?

[4 marks]

3.  Software tools

(a)  State 2 software development tools that were used as part of the team develop- ment process.

[2 marks]

In each case explain:

i. the purpose of that tool as part of the development process

[6 marks] ii. the main strength of using that software tool in the way you describe

[6 marks]

iii. reflecting on your project, whether you would recommend that tool to a software engineering team

[6 marks]