Programme:

Bachelor of Building & Construction Management

Unit Code:

10141

Unit Title:

Construction Procurement

Distributed on:

Canvas on Friday 2nd  March 2026

Submission Time and Date:

To be submitted by 23:59 on April 2nd April 2026

Word Limit

3,000  10%)

Please include the word count on the cover page.

Expectation of Submission:

A report structured professionally, reflecting the key elements required by the tasks that are presented below in this assignment specification.

An e-copy in PDF format submitted via Canvas is required.

Weighting

This assignment accounts for [ 45 ]% of the total mark for this unit

Group

Assignment

No

INSTRUCTIONS ON ASSIGNMENT

Assignment Title

Case Study of the Heathrow Airport Expansion Project: A Research Report for Procurement

Mapping to the Unit Learning Outcomes (ULO)

1)   Distinguish and employ the principles of typical and complicated construction procurement strategies, which  include  but  are  not  limited  to  the   Construct  Only,   Design  &  Construct,  Public-Private Partnerships (PPPs) etc (ULO1)

2)   Practice and manage the decision-making process to select appropriate procurement strategies for construction  and  complex  infrastructure  projects,  under  the  relevant  regulatory  framework  and standards (ULO2)

3)   Apply and implement construction procurement strategies, and relevant management practices, to manage the risks and enable the successful outcomes for the above-mentioned projects (ULO3)

Background Information and Introduction

Case Study Background

In response to increasing capacity constraints and long-term growth in aviation demand, proposals have been advanced to expand London Heathrow Airport through the development of a third runway and associated infrastructure upgrades. The expansion seeks to enhance the UK’s global connectivity, strengthen trade and employment  opportunities,  and  support  national  economic  growth.  The  project  is  being  progressed  in alignment with the UK Government policy framework and regulatory requirements, with procurement strategy development forming a critical component of the next stage. Your organisation has been appointed by the client to provide consultancy services to support decision-making in selecting an appropriate procurement method for delivering the new runway project.

Tasks for Students:

You have been assigned by your organisation to produce a professional research report for the procurement decision-making of the Heathrow Airport Expansion, which is expected to identify and clearly discuss:

Task 1: Project Objectives and Stakeholders

•     Project goal and purpose(s)

•     Key stakeholder network of the project; and

•     Key stakeholders’ expectations.

Task 2: Project Risk Identification and Assessment

•     Possible risks associated with the delivery of the project; and

•     Impacts of the possible risks on the project.

Task 3: Procurement Options for the project

•    Two procurement strategies that will be suitable for the project (e.g., Construct Only, Design and Construct, Divided (Contract) Strategy, or Public-Private Partnerships); and

•     Suitability of the identified two procurement options (i.e., why are they better suited for the project than others?).

Unit Specific Assessment Criteria and Rubric

Project background analysis: An identification and rationally relevant discussion of the objectives and key stakeholder elements of the Heathrow Airport Expansion project, with references to appropriate and reliable literature (Task 1) (10 Pts).

Project risk management: A rational identification of and assessment for the risks that are associated with the lifecycle of the project, with references to appropriate and reliable literature (Task 2) (10 pts).

Procurement Option Analysis: A rational identification of and clear discussion on the possible procurement options for the project, with reference to appropriate and reliable literature. (Task 3) (20 Pts).

Communication  and  Referencing:  A  professional   presentation  and  structure  containing  components necessary for a professional report with a clear, logical and organised writing style that is free of spelling and grammatical errors, and correctly referenced in accordance with the Harvard style (5 Pts).

Table 1. Marking rubric

 

Higher Distinction

Distinction

Merit

Satisfactory

Poor

 

85% plus

75% - 84%

65% - 74%

50% - 64%

50% or less

Project

background

analysis (10 pts)

 

 

 

 

 

Project risk management (10 pts)

 

 

 

 

 

Procurement

option analysis (20 pts)

 

 

 

 

 

Communication and referencing (5 pts)