ARCH 1261 Construction and Structure 2
Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: daixieit
ARCH 1261
Construction and Structure 2
Submission 3: Construction Documentation Report
For the third assignment, students will complete the structural solution for the architectural scheme given to you. The Construction Documentation Report will be a series of A3 panels. In this submission, you will have the opportunity to develop and present your own structural solution for the architectural scheme assigned. The report will comprise structural floorplans, sections and details.
Figure: Example of a 1:10 Details
The mark for this assignment is 50% of the total course mark
|
CRITERIA |
Not at all |
Partially |
Entirely |
|
Overall presentation |
|
|
|
1 |
The graphic quality of the drawings at 1:50 scale is clear and responds to the Australian Standards specification |
0 |
3 |
6 |
2 |
The graphic quality of the drawings at 1:10 scale is clear and responds to the Australian Standards specification |
0 |
3 |
6 |
3 |
The 1:50 drawings are provided with diamensioning |
0 |
2 |
3 |
4 |
The 1:10 drawings are provided with diamensioning |
0 |
2 |
3 |
5 |
The catalogues or suppliers from where the building components are chosen is clearly identified |
0 |
2 |
4 |
6 |
The line-weight improves the drawings legibility |
0 |
2 |
4 |
|
Retaining Wall |
|
|
|
7 |
The sections showing the retaining wall demonstrates the correct drainage strategy |
0 |
2 |
5 |
|
Foundation |
|
|
|
8 |
The sections showing the foundations demonstrates the correct water-proofing and damp-proofing strategy |
0 |
1 |
2 |
9 |
The sections showing the foundations demonstrates the layering of materials underneath the foundation slab |
0 |
1 |
2 |
|
Structural Frame |
|
|
|
10 |
The position of the columns is correctly identified in relation to the project layout |
0 |
2 |
4 |
11 |
The position of the primary beams is correctly identified |
0 |
2 |
4 |
12 |
The size of the primary beams is correctly identified |
0 |
2 |
4 |
13 |
The position of the secondary beams is correctly identified |
0 |
2 |
4 |
14 |
The size of the secondary beams is correctly identified |
0 |
2 |
4 |
15 |
The strategy to guarantee lateral stifness in one direction is correctly identified |
0 |
3 |
5 |
16 |
The strategy to guarantee lateral stifness in a second direction is correctly identified |
0 |
3 |
5 |
17 |
All connections between frame-components (columns, beams, cross-bracing) are correctly identified |
0 |
4 |
9 |
|
Balcony |
|
|
|
18 |
The size of the balcony components is correctly identified |
0 |
2 |
4 |
19 |
The connections between the balcony components and the building skeleton is correctly identified and in equilibrium |
0 |
2 |
4 |
|
Stairs |
|
|
|
20 |
The stairs are designed following the Australian standard |
0 |
1 |
3 |
21 |
The stairs components are correctly connected to the building frame |
0 |
1 |
3 |
|
Roof |
|
|
|
22 |
The components of the roof are correctly assembled together |
0 |
2 |
4 |
23 |
The roof structure is correctly cross-braced |
0 |
2 |
4 |
24 |
The voids for the skylights are correctly designed |
0 |
1 |
2 |
25 |
The supports for the gutters are correctly identified |
0 |
1 |
2 |