Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: daixieit

SESSION 2022/2023 SEMESTER 2

MEEM 1763 SYSTEM IDENTIFICATION AND ADAPTIVE CONTROL

PROJECT 2

TOTAL MARKS: 30 Marks

Submission Date: 30 June 2023

Design the indirect’ and direct’ self-tuning GMVC for a chemical process described by the following transfer function:

where TD  is the time delay of the process and t is the time constant. Assume that the value of 

i)   Detail out the design process for both controllers. You can approximate the time delay term  using any suitable approximation to obtain its continuous-time transfer function before starting to design your controllers.

ii)  Compare  the  performance  of the  two  controllers via computer simulation (with any suitable computer software).   You can use any suitable reference signals to show the effectiveness of your controllers.